Avaya Business Ethernet Switch 50 Series Průvodce konfigurací Strana 45

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 72
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 44
Configuring a smaller remote site (Greenfield and infrastructure replacement) 45
The installation sequence is a critical component of this minimal
configuration scenario. Nortel recommends that you wait a few minutes
between configuring and installing each device to allow each device to
complete the boot cycle.
Connecting network devices for a smaller remote site (Greenfield and
infrastructure replacement)
Step Action
1
Connect the network devices as follows:
a. Connect the WAN port of the BSR222 to the Internet provider.
b. Connect the BES100/200s to the LAN ports on the BSR222.
c. Connect BAP120s to PoE ports on the BES100/200 if PoE ports
are available. If not, connect BAP120s to LAN ports on the
BES100/200.
—End—
SMB
Small and Medium Business Solutions Overview and Configuration Guide
NN47910-200 02.01 Standard
Release 1.00 11/22/2006
Copyright © 2006, Nortel Networks Nortel Networks Confidential
.
Zobrazit stránku 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 71 72

Komentáře k této Příručce

Žádné komentáře