Avaya Redundancy BCM Rls 6.0 Uživatelský manuál Strana 7

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 33
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 6
Redundancy
NN40011-048 Issue 1.2 BCM450 Rls 6.0 7
Flowchart
This flowchart depicts the steps necessary to upgrade a BCM 450 with a
redundancy kit and RAID kit.
Prepare the BCM 450 for upgrade: Refer to the Preparing the BCM
450 for Redundancy Kit Installation section of this guide
Check that you have the required components to install: Refer to the
Installing the Redundancy & RAID Kit section of this guide
Install a Secondary Fan and Faceplate: Refer to the Installing the
Secondary Fan and Faceplate section of this guide
Check that the RAID service is enabled: Refer to the Enabling the
RAID Service after Upgrade section of this guide
Install a Secondary Hard Disk Drive: Refer to the Installing the
Secondary Hard Disk Drive section of this guide
Check that you meet the Requirements for upgrading the BCM with a
Redundancy or RAID Kit: Refer to the Overview section of this guide
Zobrazit stránku 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 32 33

Komentáře k této Příručce

Žádné komentáře