Avaya PeriView Reference Manual (Software Release 2.1) - Business Communications Manager Uživatelský manuál Strana 149

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 288
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 148
Application Manager — Overview
# P0602566 Ver: 2.7 Page 135
What affects the order of items on the list?
Initially, the order of this list is determined by the order in which applications were
assigned with the Assign action. Once applications are assigned, you can redefine
their default assign/start order.
As subsequent applications are assigned with the Assign action, they are appended to
the list in the Locations window. To maintain the correct order, check the list after
assigning applications and reorder the list if necessary.
Where is the information stored?
When you assign a main application (call processing or administrative) with the
Assign action, information about the application is appended to the configuration file
aseLines.cfg. This file identifies the list of applications that execute on the
specified component and the phone lines to which they are assigned.
The aseLines.cfg file resides at the following locations.
Solaris: $MPSHOME/component_typeN/etc/aseLines.cfg
Windows 2000:%MPSHOME%\component_typeN\etc\aseLines.cfg
Each time you assign a main application, the name of the application, the line to which
it is assigned, and your user name, gets appended the list in this file.
The order in which applications are listed in aseLines.cfg determines the order in
which applications are listed when the Application Management window is opened.
When the list is reordered with the Reorder action, the new order is saved in the
aseLines.cfg file.
How do I reorder the list?
You define the Line Start Order by selecting the component and lines that are to be
reordered. You can reorder this list using the up and down arrows. Any move must be
applied before it becomes effective.
When you reorder the lines that are in use, ensure that all the lines (that need to be re-
ordered) are selected.
To define the line start order:
In the Comps scrolling window, select the component where the phone lines
are to be reordered.
In the Lines scrolling window, select the application(s) that are to be
reordered. You can select and move applications individually or you can
multiply select applications and move the group.
Select applications by <L
EFT> clicking the mouse button on the line to be moved.
A line must be selected before it can be reordered.
Zobrazit stránku 148
1 2 ... 144 145 146 147 148 149 150 151 152 153 154 ... 287 288

Komentáře k této Příručce

Žádné komentáře