Installing and MaintainingBN Platforms Part No. 109352-E Rev. ADecember 1996
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Bay Networks Software License (continued)
Installing and Maintaining BN Platforms5-4 109352-E Rev. AFigure 5-1. Removing a Flash or PCMCIA SRAM Memory CardTo install a Flash or PCMCIA SRAM mem
Hot-Swapping Hardware Components109352-E Rev. A 5-5 Protecting Memory Card FilesBay Networks ships each memory card with its Read-Write Protect switch
Installing and Maintaining BN Platforms5-6 109352-E Rev. AFigure 5-2. Memory Card Read-Write Protect Switch4.Reinsert the memory card into the card re
Hot-Swapping Hardware Components109352-E Rev. A 5-7 To replace the 3-V lithium battery:1. Insert a slender pointed object, such as the end of a paper
Installing and Maintaining BN Platforms5-8 109352-E Rev. AWhen removing or installing a link module, keep the following in mind:• If you replace a lin
Hot-Swapping Hardware Components109352-E Rev. A 5-9 Figure 5-3. Link Modules and the SRM-L in a BLN Remove a link module or SRM-L as follows:1. Discon
Installing and Maintaining BN Platforms5-10 109352-E Rev. AFigure 5-4. Link Modules and the SRM-L in a BLN-2 COM 1DSTXCVRFAILRLDS2RYELNSRTRCVRWFAILRL
Hot-Swapping Hardware Components109352-E Rev. A 5-11 Figure 5-5. Link Modules and the SRM-L in a BCNInstall a link module or SRM-L as follows:1. Slide
Installing and Maintaining BN Platforms5-12 109352-E Rev. A4. Connect the desired cables to the module.Replacing a Routing Engine Module or SRM-FThe B
Hot-Swapping Hardware Components109352-E Rev. A 5-13 • Before removing or installing a module, you must first access the interior of your hardware plat
109352-E Rev. A xi Contents About This Guide Audience ...
Installing and Maintaining BN Platforms5-14 109352-E Rev. AFigure 5-7. Routing Engine Modules and the SRM-F in a BLN-2Note: Only Slot 1 (the bottom sl
Hot-Swapping Hardware Components109352-E Rev. A 5-15 Figure 5-8. Routing Engine Modules and the SRM-F in a BCNSRM-FPOWERRUNBOOTDIAGB A C K B O N E N
Installing and Maintaining BN Platforms5-16 109352-E Rev. ARemove a routing engine module or SRM-F as follows:1. Gently pull the inside of the board e
Hot-Swapping Hardware Components109352-E Rev. A 5-17 3.Swing the extractors forward to lock the board in place.4. Observe the module and front-panel L
Installing and Maintaining BN Platforms5-18 109352-E Rev. A6. Replace the EMC shield and front bezel. (Refer to Chapter 4, “Accessing the Interior,” f
Hot-Swapping Hardware Components109352-E Rev. A 5-19 To keep the BCN RLC powered up while you turn off a power switch or remove a power cord for a pow
Installing and Maintaining BN Platforms5-20 109352-E Rev. AIf you end up with a negative number, the power supplies cannot support the ILI configuratio
Hot-Swapping Hardware Components109352-E Rev. A 5-21 Figure 5-10. Removing a Power Module from a BLN-2
Installing and Maintaining BN Platforms5-22 109352-E Rev. AInsert a BLN-2 power module as follows:1. Grasp the handle and guide the module into the de
Hot-Swapping Hardware Components109352-E Rev. A 5-23 Figure 5-11. Removing a Power Module from a BCNInsert a BCN power module as follows:1. Grasp the
xii 109352-E Rev. A Powering On the BLN ...1-12LED A
Installing and Maintaining BN Platforms5-24 109352-E Rev. AIf the Power OK LED does not turn on, contact the Bay Networks Technical response Center.Re
Hot-Swapping Hardware Components109352-E Rev. A 5-25 Figure 5-12. Double-Fan Tray in the BLN-2Remove a single-fan tray from the rear of the BLN-2 as f
Installing and Maintaining BN Platforms5-26 109352-E Rev. AFigure 5-13. Single-Fan Trays in the BLN-2Insert a fan tray as follows:1. Grasp the bottom
Installing and Maintaining BN Platforms5-28 109352-E Rev. A
109352-E Rev. A 6-1 Chapter 6Switches and LEDsRead this chapter for a description of the switches and LEDs on the front-panel of each Backbone Node ha
Installing and Maintaining BN Platforms6-2 109352-E Rev. AReset SwitchThe Reset switch warm-starts the hardware platform. A warm-start is equivalent t
Switches and LEDs109352-E Rev. A 6-3 620-Watt Power Module LEDThis section describes the function of the green Power OK LED on each of the 620-watt BL
Installing and Maintaining BN Platforms6-4 109352-E Rev. AFigure 6-2. 620-Watt Power Module Power OK LEDThe Power OK LED indicates that the hardware p
109352-E Rev. A A-1 Appendix ADial-Up Services ModemsThis appendix lists some modems that support Version 7 Dial-Up Services and provides configuration
109352-E Rev. A xiiiEnvironmental Requirements ...3-8Setting Up the Backbone
Installing and Maintaining BN PlatformsA-2 109352-E Rev. AAdtran DSU III ARV.35 connection and V.25bis setup:# from front panel to get menu3 Config1 Lo
Dial-Up Services Modems109352-E Rev. A A-3 Codex 3260RS-232 connection using Raise DTR setup:ACU OptionsAT Form: DTR Dial (originating side), Sync Dat
Installing and Maintaining BN PlatformsA-4 109352-E Rev. ACodex 3261 FastV.25bis setup:ACU Options Terminal OptionsACU Select = v25b DTE Rate = 9600AT
Dial-Up Services Modems109352-E Rev. A A-5 Multi-Tech Multi-ModemV.25bis setup:DIP Switches1 : up2 : up3 : down4 : up5 : up6 : down7 : up8 : down9 : d
Installing and Maintaining BN PlatformsA-6 109352-E Rev. ANEC N6450 Data Service Unit V.25bis setup:DTEDTE Command Set = V.25 SyncV.35TX Clock = NormD
Dial-Up Services Modems109352-E Rev. A A-7 NEC N963E Plus (RS232)V.25bis setup:Jumpers1 : OFF2 : ON V.25bis3 : ON hdlc4 : OFF speed5 : OFF speed6
Installing and Maintaining BN PlatformsA-8 109352-E Rev. ATelebit T3000When configuring the modem, place the A/B switch in the A position. Configuration
Dial-Up Services Modems109352-E Rev. A A-9 Telebit T3000 (continued)Raise DTR setup (continued):Answering Sideat&f16 – preset configurationatt – en
Installing and Maintaining BN PlatformsA-10 109352-E Rev. ATylink SNS 4000 (V.35 ISDN PRI DSU) - Tested in back-to-back IMUX mode - Tested with V.25bi
109352-E Rev. A Index-1 Aair flow moduleremoval and installation, 4-9 to 4-11air plenumBCN, 3-7BLN, 1-6BLN-2, 2-6altitude specificationsBCN, 3-8BLN, 1-7
xiv 109352-E Rev. A Appendix A Dial-Up Services Modems Adtran DSU III AR ...
Installing and Maintaining BN PlatformsIndex-2 109352-E Rev. ABLN, 1-14BLN-2, 2-15operating parametersBCN, 3-20BLN, 1-14BLN-2, 2-15Customer Service FT
Index109352-E Rev. A Index-3 front bezel, removal and replacement of, 4-2 to 4-3front-panelSee also front bezelswitches and LEDs, 6-1GGAME operating s
Installing and Maintaining BN PlatformsIndex-4 109352-E Rev. Aoperating parametersBCN, 3-22BLN, 1-15BLN-2, 2-16Oopening the router, 4-2 to 4-8operatin
Index109352-E Rev. A Index-5 requirementsair plenumBCN, 3-7BLN, 1-6BLN-2, 2-6altitudeBCN, 3-8BLN, 1-7BLN-2, 2-7electricalBCN, 3-6BLN, 1-5BLN-2, 2-5env
Installing and Maintaining BN PlatformsIndex-6 109352-E Rev. ATTechnician Interfaceaccessing from BLN, 1-14Technician Interface, accessing fromBCN, 3-
109352-E Rev. A xv Figures Figure 1-1. Backbone Link Node (BLN) ...1-2Figure 1-2.
xvi 109352-E Rev. A Figure 4-7. Inserting or Removing an Air Flow Module ...4-10Figure 4-8. Grasping the Ai
109352-E Rev. A xvii Tables Table 1-1. BLN Shipment Contents ...1-3Table 1-2.
xviii 109352-E Rev. A Table 6-1. Front-Panel LEDs ...6-2
xix About This Guide If you are responsible for installing and configuring Bay Networks Backbone Node hardware platforms, read this guide for installa
4401 Great America Parkway 8 Federal StreetSanta Clara, CA 95054 Billerica, MA 01821 Copyright © 1988–1996 Bay Networks, Inc. All rights reserved. Pr
Installing and Maintaining BN Platformsxx Conventions angle brackets (< >) Indicate that you choose the text to enter based on the description
-xxi Acronyms ANSI American National Standards InstituteARE ATM Routing EngineATM Asynchronous Transfer ModeBN Backbone NodeBCN Backbone Concentrator
Installing and Maintaining BN Platformsxxii Ordering Bay Networks Publications To purchase additional copies of this document or other Bay Networks p
109352-E Rev. A xxiii Technical Support and Online Services To ensure comprehensive network support to our customers and partners worldwide, Bay Net
Installing and Maintaining BN Platformsxxiv 109352-E Rev. A Bay Networks Customer Service If you purchased your Bay Networks product from a distribu
Technical Support and Online Services 109352-E Rev. A xxv Bay Networks Information Services Bay Networks Information Services provide up-to-date sup
Installing and Maintaining BN Platformsxxvi 109352-E Rev. A Support Source CD This CD-ROM -- sent quarterly to all contracted customers -- is a compl
Technical Support and Online Services 109352-E Rev. A xxvii InfoFACTS InfoFACTS is the Bay Networks free 24-hour fax-on-demand service. This automat
109352-E Rev. A 1-1 Chapter 1Installing the Backbone Link NodeYou install the Backbone Link Node (BLN) hardware platform by• Preparing for installat
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 USA Requirements Only Federal Communication
Installing and Maintaining BN Platforms1-2 109352-E Rev. ABackbone Link Node OverviewThe Backbone Link Node is a multiprotocol hardware platform/bridg
Installing the Backbone Link Node109352-E Rev. A 1-3 Preparing for InstallationTo prepare for the BLN installation, verify the following:• Your BLN sh
Installing and Maintaining BN Platforms1-4 109352-E Rev. ACablesMake sure that you received the correct cables with your shipment. If you plan to buil
Installing the Backbone Link Node109352-E Rev. A 1-5 Site RequirementsTo obtain satisfactory BLN performance, your site must meet all of the following
Installing and Maintaining BN Platforms1-6 109352-E Rev. ASpace RequirementsMake sure the installation site is large enough for the BLN and provides s
Installing the Backbone Link Node109352-E Rev. A 1-7 Environmental RequirementsThe installation site must meet the environmental requirements listed i
Installing and Maintaining BN Platforms1-8 109352-E Rev. Aa. If your rack does not have threaded holes, place cage nuts over the holes before you atta
Installing the Backbone Link Node109352-E Rev. A 1-9 Figure 1-2. Attaching Angle Brackets to Support the BLNInstalling the BLNThis section describes h
Installing and Maintaining BN Platforms1-10 109352-E Rev. AInstall the BLN in the rack as follows:1. Using both hands, pull the bottom of the front be
Installing the Backbone Link Node109352-E Rev. A 1-11 Figure 1-4. Mounting the BLN to the RackReplace the front bezel as follows:1. Align the mounting
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Japan/Nippon Requirements Only Voluntary Co
Installing and Maintaining BN Platforms1-12 109352-E Rev. APowering On the BLNPower on the BLN as follows: 1. Ensure that the power switch on the rear
Installing the Backbone Link Node109352-E Rev. A 1-13 LED Activation SequenceThe LEDs on the front panel of the BLN (Figure 1-5) activate while the BL
Installing and Maintaining BN Platforms1-14 109352-E Rev. AThe BLN indicates a successful start-up by turning off the BOOT LED. The POWER and RUN LEDs
Installing the Backbone Link Node109352-E Rev. A 1-15 Figure 1-6. Cabling the BLN to a ConsoleRemote ConnectionThis section describes how to cable you
Installing and Maintaining BN Platforms1-16 109352-E Rev. A2. Remove the cable connector from the CONSOLE port of the System Resource Module-Link (SRM
109352-E Rev. A 2-1 Chapter 2Installing the Backbone Link Node-2You install the Backbone Link Node-2 (BLN-2) hardware platform by• Preparing for insta
Installing and Maintaining BN Platforms2-2 109352-E Rev. ABackbone Link Node-2 OverviewThe BLN-2 is a multiprotocol hardware platform and bridge desig
Installing the Backbone Link Node-2109352-E Rev. A 2-3 Preparing for InstallationTo prepare for the BLN-2 installation, verify the following:• Your BL
Installing and Maintaining BN Platforms2-4 109352-E Rev. ACablesMake sure that you received the correct cables with your shipment. If you plan to buil
Installing the Backbone Link Node-2109352-E Rev. A 2-5 Site RequirementsTo obtain satisfactory BLN-2 performance, your site must meet all of the follo
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Canada Requirements Only Canada CS-03 Rules
Installing and Maintaining BN Platforms2-6 109352-E Rev. ASpace RequirementsMake sure the installation site is large enough for the BLN-2 and provides
Installing the Backbone Link Node-2109352-E Rev. A 2-7 Environmental RequirementsThe installation site must meet the environmental requirements listed
Installing and Maintaining BN Platforms2-8 109352-E Rev. Ab. Locate the next two holes below this spot that have a 0.625-in. space between them.2. Mou
Installing the Backbone Link Node-2109352-E Rev. A 2-9 Figure 2-2. Locating the Mounting Holes0.625"1.125"1.750"2.375"Mounting Hol
Installing and Maintaining BN Platforms2-10 109352-E Rev. AFigure 2-3. Attaching Angle Brackets to Support the BLN-2Bracket(2 Places)Screw(2 Places)If
Installing the Backbone Link Node-2109352-E Rev. A 2-11 Installing the BLN-2 Install the BLN-2 in the electronic enclosure rack as follows:1. Using bo
Installing and Maintaining BN Platforms2-12 109352-E Rev. A2. Insert the BLN-2 in the rack as shown in Figure 2-5. Make sure the BLN-2 rests squarely
Installing the Backbone Link Node-2109352-E Rev. A 2-13 Powering On the BLN-2Power on the BLN-2 as follows:1. Ensure that the power switches on the re
Installing and Maintaining BN Platforms2-14 109352-E Rev. ALED Activation SequenceThe LEDs on the front panel of the BLN-2 (Figure 2-6) activate while
Installing the Backbone Link Node-2109352-E Rev. A 2-15 The BLN-2 indicates a successful start-up by turning off the BOOT LED. The POWER and RUN LEDs
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Canada Requirements Only (continued) D. O.
Installing and Maintaining BN Platforms2-16 109352-E Rev. A3. Insert the female end of the cable into the ANSI console communications port.Figure 2-7.
Installing the Backbone Link Node-2109352-E Rev. A 2-17 2.Remove the cable connector from the CONSOLE port of the System Resource Module-Link (SRM-L).
109352-E Rev. A 3-1 Chapter 3Installing the BCN and BCN RLCYou install the Backbone Concentrator Node (BCN) by• Preparing for installation• Setting up
Installing and Maintaining BN Platforms3-2 109352-E Rev. ABackbone Concentrator Node OverviewThe BCN is a multiprotocol router/bridge designed to sati
Installing the BCN and BCN RLC109352-E Rev. A 3-3 Figure 3-1. Backbone Concentrator Node (BCN)Preparing for InstallationTo prepare for the BCN install
Installing and Maintaining BN Platforms3-4 109352-E Rev. AShipment ContentsVerify that the items in the BCN shipment match the items on the packing li
Installing the BCN and BCN RLC109352-E Rev. A 3-5 Additional EquipmentYou need to supply the additional equipment listed in Table 3-2.Site Requirement
Installing and Maintaining BN Platforms3-6 109352-E Rev. AElectrical RequirementsThe installation site must provide a power source that meets the foll
Installing the BCN and BCN RLC109352-E Rev. A 3-7 Space RequirementsMake sure the installation site is large enough for the BCN and provides sufficient
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Canada Requirements Only (continued) Canad
Installing and Maintaining BN Platforms3-8 109352-E Rev. AEnvironmental RequirementsThe installation site must meet the environmental requirements lis
Installing the BCN and BCN RLC109352-E Rev. A 3-9 Figure 3-2. Locating the Mounting Holes2.Mount the angle brackets in the area indicated by Figure 3-
Installing and Maintaining BN Platforms3-10 109352-E Rev. Ab. Align the edge of the brackets to the rack:-- If the interior of the rack contains horiz
Installing the BCN and BCN RLC109352-E Rev. A 3-11 Figure 3-3. Attaching Brackets to Support the BCNBracket(2 Places)Height 28 in. (71 cm)
Installing and Maintaining BN Platforms3-12 109352-E Rev. AInstalling the BCNPrepare the BCN for installation as follows:1. Remove each power module (
Installing the BCN and BCN RLC109352-E Rev. A 3-13 2.Lift and remove the BCN from its shipping platform and place it gently on the floor.3. Using both
Installing and Maintaining BN Platforms3-14 109352-E Rev. AInstall the BCN in the electronic enclosure rack as follows:1. Insert the BCN in the rack a
Installing the BCN and BCN RLC109352-E Rev. A 3-15 2.Insert and tighten the screws with a screwdriver until secure.Replace the front bezel as follows:
Installing and Maintaining BN Platforms3-16 109352-E Rev. AFigure 3-7. BCN and BCN RLC Power Systems5.Verify that the POWER OK LED on each power modul
Installing the BCN and BCN RLC109352-E Rev. A 3-17 If an LED is not on, replace the power module. (Refer to Chapter 5, “Hot-Swapping Hardware Componen
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 T1 Service Compliance Statements T1 Service
Installing and Maintaining BN Platforms3-18 109352-E Rev. AFigure 3-9. BCN Front-Panel LEDsThe LEDs typically activate in the following order (the seq
Installing the BCN and BCN RLC109352-E Rev. A 3-19 The BCN indicates a successful start-up by turning off the BOOT LED. The POWER and RUN LEDs remain
Installing and Maintaining BN Platforms3-20 109352-E Rev. AEstablishing a Local or Remote Connection to the BCNYou can cable a BCN to an ANSI console
Installing the BCN and BCN RLC109352-E Rev. A 3-21 Figure 3-10. Cabling the BCN to a ConsoleRemote ConnectionCable the BCN to the modem as follows:1.
Installing and Maintaining BN Platforms3-22 109352-E Rev. A2. If you have not already done so, remove the cable connector from the CONSOLE port of the
109352-E Rev. A 4-1 Chapter 4Accessing the InteriorExperienced network operators can safely perform the user-serviceable procedures that are described
Installing and Maintaining BN Platforms4-2 109352-E Rev. ARemoving and Replacing the Front BezelYou must remove the front bezel (front cover) of BLN,
Accessing the Interior109352-E Rev. A 4-3 Figure 4-2. Removing the BLN-2 Front BezelRemove the front bezel from the BCN (Figure 4-3) as follows:1. Usi
Installing and Maintaining BN Platforms4-4 109352-E Rev. AFigure 4-3. Removing the Front Bezel from the BCNPOWERRUNBOOTDIAGB A C K B O N E N O D ERES
Accessing the Interior109352-E Rev. A 4-5 Attaching the Antistatic Wrist StrapEach BLN, BLN-2, BCN, and BCN RLC ships with an antistatic wrist strap.
Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Bay Networks Software License This Software
Installing and Maintaining BN Platforms4-6 109352-E Rev. AFigure 4-4. Connecting the Wrist Strap Jack to the Antistatic ReceptacleRemoving and Replaci
Accessing the Interior109352-E Rev. A 4-7 Remove the EMC shield (Figure 4-5) as follows:1. Remove the front bezel. (Refer to “Removing and Replacing t
Installing and Maintaining BN Platforms4-8 109352-E Rev. AFigure 4-5. BLN and BCN EMC ShieldsVOR jeglicher Intervention GeratABSTELLEN und Netzstecker
Accessing the Interior109352-E Rev. A 4-9 Removing and Installing an Air Flow ModuleBay Networks ships an air flow module in each empty FRE/FRE-2 slot
Installing and Maintaining BN Platforms4-10 109352-E Rev. Ab. Remove the bracket.4. Pull the front of the air flow module forward to remove it (Figure
Accessing the Interior109352-E Rev. A 4-11 Figure 4-8. Grasping the Air Flow ModuleBack Edge of Air Flow ModuleSpace for Locating PinSpace for Power C
109352-E Rev. A 5-1 Chapter 5Hot-Swapping Hardware ComponentsDepending on your hardware platform, you can replace the following user-serviceable hardw
Installing and Maintaining BN Platforms5-2 109352-E Rev. ADepending on your model, you will need a Phillips screwdriver, a standard screwdriver, or bo
Hot-Swapping Hardware Components109352-E Rev. A 5-3 Memory Card Read-Write Protect SwitchMemory cards are read-write protected. To change the protecti
Komentáře k této Příručce