Avaya (109352-E, Uživatelský manuál Strana 47

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 144
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 46
Installing the Backbone Link Node-2
109352-E Rev. A 2-3
Preparing for Installation
To prepare for the BLN-2 installation, verify the following:
Your BLN-2 shipment arrived complete and undamaged
You have the proper tools and equipment
Your installation site meets all BLN-2 site requirements
These requirements are described in detail in the next sections.
Shipment Contents
Verify that the items in the BLN-2 shipment match the items on the packing list
affixed to the shipping container (T
able 2-1).
Table 2-1. BLN-2 Shipment Contents
Item Quantity
Backbone Link Node-2 1
Site Manager Application Software (diskettes or CD-ROM) 1
System software memory card (installed in unit) 1
Hardware package for attaching angle brackets to the electronic
enclosure rack (required):
– Rack-mount brackets
– 10-32 x 0.5-in. panel-mount screws
– 10-32 cage nuts
2
4
4
Hardware package for mounting BLN-2 in an electronic enclosure rack:
– 10-32 x 0.5-in. panel-mount screws
– 10-32 cage nuts
8
8
Power cords 2
Optional: Shielded console cable 1
Zobrazit stránku 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 143 144

Komentáře k této Příručce

Žádné komentáře